Skip to main content
A renovated kitchen with island seating in a Sharon Woods home, Charlotte

Remodeling

Renovating a Sharon Woods Home

Mid-century houses respond exceptionally well to intelligent renovation — and punish the uncoordinated kind.

The typical Sharon Woods house was built for a way of living that no longer exists: a closed kitchen, a formal living room nobody uses, small bedrooms, one modest bathroom per floor, and no relationship to the back yard.

Everything about that is fixable, and the underlying construction — solid framing, brick exterior, real hardwood, generous lot — is worth fixing. The question is sequence and coordination, not possibility.

What these houses actually need

Across dozens of renovations in neighborhoods of this vintage the same list recurs. Do the invisible items first; they are the ones that make everything else durable.

  • Kitchen opened to a family or living space and enlarged toward the rear
  • A primary suite created — almost never present as built
  • Bathroom count and size brought to contemporary expectation
  • Electrical service upgraded and any remaining original wiring replaced
  • HVAC sized correctly for the post-renovation envelope, with real ductwork
  • Plumbing supply and drain replacement, including the sewer lateral
  • Insulation, air sealing, and attic ventilation — the highest-return invisible work
  • Windows replaced or restored, with attention to the front elevation's proportions
  • Crawlspace encapsulation and moisture control
  • A genuine connection to the back yard: doors, porch, terrace

Addition strategy

Most successful Sharon Woods renovations add to the rear rather than up. Rear additions preserve the street elevation, keep the existing roof line intact from the sidewalk, and use the depth these lots have. Second-story additions are possible but expensive — they usually require foundation and framing reinforcement — and they change the house's relationship to the street in ways that need real design attention.

The most common good outcome: a rear addition holding kitchen, family room, and a primary suite, with the original front rooms restored and repurposed.

Budget and how it behaves

Renovation budgets in houses of this age carry irreducible uncertainty, because a meaningful percentage of the scope is behind finished surfaces. Two disciplines control this: invasive investigation before the contract is priced, and a contingency that is actually held rather than spent in month two.

A useful frame: divide the budget into non-negotiable systems, structural and envelope work, and finishes. Cut finishes if you must. Never cut systems — you will pay for them twice.

Permits and inspections

Structural changes, additions, electrical, plumbing, and mechanical work require permits through Mecklenburg County Code Enforcement, with inspections at defined stages. Unpermitted work surfaces at resale and can become expensive to legitimize retroactively.

Older Sharon Woods houses frequently carry open or missing permits from previous decades' work. Resolve them during your project while the walls are open, not during a future buyer's due diligence.

Living in it or moving out

For a whole-house renovation, move out. The schedule compresses, the trades work faster and more safely, dust containment stops being a daily negotiation, and the total cost frequently comes out lower even after temporary housing. For a kitchen-only or bath-only project, staying is reasonable.

Sequencing across years

If the whole scope is not affordable at once, sequence it so nothing gets built twice: systems and envelope first, then structure and additions, then kitchen and baths, then finishes and landscape. The most expensive renovations are the ones done in the reverse order.

Featured Contractor

Renovation is a coordination problem before it is a construction problem

Architect, builder, designer, and low-voltage integrator working from one plan produces a house that feels inevitable. Four trades hired sequentially produces a house that feels assembled.

Custom Homes & Renovations

Peters Custom Homes

Visit Peters Custom Homes

Advertising disclosure. This is a paid or affiliated relationship: the firm above is affiliated with or compensates the publisher of this independent guide, and contacting it may result in a commercial engagement. It does not buy editorial placement. Full disclosure.

Questions & Answers

Frequently asked questions

Direct answers to what readers most often ask about this section of the guide. Each answer cites the primary source it rests on.

All Sharon Woods questions →

Are Sharon Woods homes worth renovating?

+

The original construction — solid framing, brick exteriors, hardwood floors, and generous lots — generally justifies renovation, and land values in the neighborhood support significant investment. The determining factor is usually the condition of systems and the structural feasibility of the layout changes required.

Source: City of Charlotte / Mecklenburg County Code Enforcement permitting

Do I need a permit to renovate in Charlotte?

+

Structural changes, additions, and electrical, plumbing, and mechanical work require permits through Mecklenburg County Code Enforcement, with inspections at defined stages. Unpermitted work commonly surfaces during a future sale.

Source: City of Charlotte / Mecklenburg County Code Enforcement permitting

Should I move out during a whole-house renovation?

+

For a whole-house renovation, moving out usually compresses the schedule and lowers total cost even after temporary housing. For a single-room project such as a kitchen or bathroom, remaining in the house is generally reasonable.

Source: City of Charlotte / Mecklenburg County Code Enforcement permitting